The World Meteorological Organization warned earlier this year to “prepare for El Niño,” prompting governments to adjust agricultural practices and secure water supplies. But climate action should not wait until a dangerous event is approaching. It should be embedded in a broader strategy for planning a warming future, because the decisions made today about infrastructure and development will shape people’s safety and livelihoods for decades.
Recurring disasters cause major disruption to lives and livelihoods, while economic losses and damages can reach trillions of dollars. Climate warnings and anticipatory action can reduce the effects on people and economies, but their effectiveness is constrained by existing vulnerabilities, including unequal access to community resources and infrastructure.
Those vulnerabilities must be addressed at their source through development and infrastructure decisions. Better planning can reduce climate risks more effectively than repeated reactive responses to individual events. The location and capacity of reservoirs, agricultural drainage systems, and urban and transport infrastructure, for example, cannot easily be changed once they have been established.
Much of what is built today will shape society for decades. Meeting global climate and development goals by 2030 requires nearly US$7 trillion in infrastructure investment each year1. Global annual infrastructure spending is projected to rise from $4.4 trillion in 2024 to $6.9 trillion by 20502. But that investment could be wasted if projects are not designed for the climatic conditions people will face.
Super El Niño affects not only climate change but also health
Climate projections are often not integrated into planning, which hinders decision-making on development projects. Another challenge is the limited availability of climate information that can support reliable decisions over 5–30 years. This intermediate timescale, between seasonal and long-term forecasts, is particularly important when planning major infrastructure such as roads and reservoirs3.
Climate services can provide some of this information. Scientists can improve climate predictions, and development planners can evaluate projects. But unless these functions are connected within the development process, the overall system will remain reactive.
A common operating system for climate-informed planning could change this. Government departments responsible for development would determine which planning decisions need to take climate information into account. Planning agencies would ensure that climate assessments were completed and considered during investment approvals for climate-sensitive projects. Climate agencies would provide the scientific information. Here is how such a system could work.
Establish a climate-planning department
Central government planning agencies should establish small climate-planning departments within their existing structures rather than creating separate institutions. Where appropriate, corresponding departments could be created within state or local planning agencies. In countries without a central planning agency, existing government bodies could take on these functions.
The central department would set common standards, integrate information needs across sectors and jurisdictions, coordinate with national climate agencies, and ensure that climate considerations were incorporated into the planning and evaluation of projects of national importance. Local departments would apply the framework to local projects and communicate new requirements to the central department.
Responsibilities should be clearly defined. Ministries should identify the climate information required by different sectors. Planning agencies would coordinate those needs and ensure that the information was reflected in investment decisions. Climate authorities would produce the underlying scientific information and ensure its technical accuracy and quality.
This division of responsibilities is important. The proposal would not turn development planners into climate scientists or climate agencies into development authorities. Instead, it would create a permanent institutional connection between them.
Require climate foresight
Regulations governing public investment in development should be changed to reflect this principle. Funding for large-scale, climate-sensitive projects should not be approved without evidence that the projects have been designed for the climate they are expected to encounter.
Governments should require climate assessments for large-scale, long-term, climate-sensitive projects before approving funding. These assessments must be completed early enough to influence the project’s location, technology, scale and design. In the case of a new reservoir, for example, the relevant planning department would identify the climatic conditions likely to occur during the reservoir’s operational life. That information could then influence where and how it was built.
The climate-planning department would not decide whether a project should proceed. It would demonstrate that relevant climate risks had been assessed and that reasonable alternatives had been considered. The assessment would form part of the investment evaluation alongside economic, technical, social and environmental factors.
Make climate analysis part of planning
For the system to be effective, it must connect three functions: development needs, climate analysis and investment approval.
Ministries and agencies should regularly identify the climate information needed for future development decisions. Central planning departments would integrate these requests and work with climate authorities to determine what information could be provided, which projects required new analysis, and when investment in climate observations, modelling or scientific capacity was necessary.

The Kenyan government is taking measures to reduce flooding from rivers.Credit: James Wakibia/SOPA Images/LightRocket (via Getty)
This comprehensive approach would give climate scientists clear direction from the development system. It could encourage improved climate projections for specific regions and sectors over the typical planning periods of 5 to 30 years. It would also reduce the need for individual projects to commission their own climate analyses, which can be patchy or inconsistent.
An analysis of six generations of assessment reports by the Intergovernmental Panel on Climate Change found that inconsistent climate projections in many low- and middle-income countries complicate adaptation and long-term planning efforts4. In some regions, one assessment predicted increased precipitation, the next predicted decreased precipitation, and later assessments shifted back again.
Such disagreements undermine a region’s ability to make long-term investments. They increase the likelihood of costly misallocation of finance, failure to adapt to climate risks, and infrastructure development that is incompatible with future climate conditions. Once built, dams, cities and transport corridors cannot easily be redesigned or rebuilt.
The problem is compounded by the fact that climate models perform poorly in many climate-prone regions. In South Asia, for example, simulations of temperature and precipitation can differ from observations by up to 25% and 100%, respectively5. Such biases limit the reliability of model-based climate information for guiding long-term development decisions.
The proposed climate-informed planning sector would ensure that climate agencies’ work was based on clearly stated development needs and that the information provided was reliable and compatible with development plans. This would not replace other climate services, which could continue to provide accurate information to a wide range of sectors6,7. The aim is to bridge the practical gap between climate information and development.
Let the system learn
Climate assessments for development projects should not be abandoned once a project has been approved. Central and local planning departments should regularly monitor whether new climate observations and scientific assessments change the identified risks. When they do, the latest assessment should be sent back to the relevant planning authority.

Global emissions slow, but the world is hurtling towards 2°C warming
The climate-planning department should evaluate whether the information produced by the system is useful. Periodic technical reviews could compare climate projections with observations and assess whether the information was suitable for planning. An institutional review could also examine whether large-scale projects incorporated climate foresight and whether it influenced their design.
These reviews would create a feedback loop. Development decisions would determine what information was needed, while climate science and investment-evaluation processes would help provide it. Data from implemented projects could then be fed back into the system to update climate information and future plans.
Introduce the system
Source: www.nature.com